General Information:
Primary and Secondary Boarding Schools need flush toilets and expansions of the water collection systems. (470 students and faculty at each school with highly probable expansions to 700 in each school in 2 to 3 years). (Need: critical)
Problem:
Both Primary and Secondary schools operate on a 3 semester year that includes summer months so adequate potable water is needed. Also, pit toilets are used at both complexes and 18 flush toilets are needed with an adequate water supply to properly utilize them.
Also at the Primary School there is a well and manual water pump that approximately 2 years ago became inoperable and needs repair.
Costs:
Expansion of the Water Collection and Storage Systems at the Primary School and the installation of 18 flush toilets | $15,000 |
Expansion of the Water Collection and Storage Systems at the Secondary School and the installation of 18 flush toilets | $15,000 |
Repair existing well and hand Pump at the Primary School | $3,000 |
** On-site engineering/management required during installation | $3,000 |
Grand Total | $36,000 |